Wednesday, 25 November 2026

Signals

Signals play a very important role in the safe operation of trains on the network. Adding them to your layout gives a feel that your layout is complete and is operational as the prototype.  Often, I’m ask what signals I do need on my layout, looking at the prototype, it can be very confusing and complicated.  


The safeworking system and the number of signals at a station is built around the volume or number of trains using the network in that location or area and what trains may do at that location and the size of the station. The location of signals could vary between single and double line working as they are two completely different method of operations. The era will also play a big role in the type of signaling on the network and how it was used.   

I mainly model the 60’s/70 era, at that time there was very little double line track outside the Brisbane suburban area. The state was mainly a single line network with crossing stations to allow trains to pass or go in advance of another train. The busier sections (Brisbane to Rockhampton) had attended stations with signal cabins interlocking the points with the signals. In the early 1970’s I worked most stations on the North Coast line between Caboolture and Monkland. On a week day, the average was around 50 trains a day, give or take a few. Sunday was much quitter.  Most trains were worked with a single locomotive with a maximum length of 90 units, that’s equal to 90 four wheeled open 15 ft. “F” wagons. Include in that was about 6 passenger and 3 shunt trains in each direction. Electric staff was the safe working system and signal cabins had up to about 30 levers. The size of the signal cabin did vary quite a bit, bigger the yard, the more levers. Distant signals were operational and when worked in accordance with the rules did provide drivers with an indication of what to expect around the corner. Stations with interlock cabins could only admit one train at a time into the station yard. If two opposing trains arrived at the same time, one would wait at the “Home” signal until the other train was in clear of the running road for the other train. Coupled to this is the type of train and its importance.   

As for the rest of the state, mostly unattended stations with supervising stations 250/300 miles apart. Staff and Ticket was the safeworking system and stations had just two signals, a Up and Down “Home” signal with beacons. Beacon replaced distance signals as they are mainly a marker for an approaching station. Train crews were responsible for their own section authorities and crossing trains. In short when trains crossed or passed, the guard of the first train to arrive became the Office in Charge of the station. The “Up” home signal was set at proceed and the “Down” home signal at stop. This did change where there was a bridge on the Down end of the yard. Yes, lot of rules for everyone.


If the as attended, a station master on duty, all signals were kept at stop.


When I worked the Mt Ias line in the late 1960’s early 1970’s, three (3) trains in an 8 hour shift was a busy shift. Also, around this time a larger number of these stations were fitted with Trailable Facing points, no need to hold points when trains crossed each other, they were set for right hand running. Trains still stopped to pick up a new authority for the next section.  “Home” signals showing an proceed aspect only admit a train to the set Main Line. If a train is to enter the “Loop” line or any other road in the yard the “Home” signal is kept at “Stop” and the authority (green flag) will allow the train to enter the set road. There a number of rules that allow trains to pass “Home” signals at stop, i.e. above, unattended staff stations are one example.    


Signals at the time were mostly the McKenzie & Holland semaphore type, this also included a large part of the Brisbane suburban area where “Block Telegraph” was used up until the mid 1980’s. With the extension of crossing loops on the North Coast Line in the 1960’s, one end was fitted with electric points and colour light signals. The distance from the cabin for these points were beyond what rodding or wire could operate. 

Double line “Block Telegraph” working was very different; the station yard was part of the section. Trains mainly just followed each other. The starting/advance signal was the authority to the next starting/advance signal. In each direction there was operational distant signal, a home signal and a starting signal. If a siding came back onto the main line beyond the starting signal an advance starting signal was in place. Should a train need to be stopped at the home signal, the station in advance would give the driver a “Yellow Ticket” advising him that the “Home” signal at the next station would be at stop.   

By the 1960’s most signals were fitted with Adlake lamps, a much smaller lamp than the McKenzie & Holland lamp. Many distance signals could stay alight for 7 days. Cleaning and servicing the signal was allocated to a Lad Porter. Some locations this was a full-time job and they would do more than one station. Small stations without a Porter, the job came back to the station officers (SM / ASM) to do between trains.   


Let’s look at some signals and their application.


Tiaro (North Coast Line), Interlock station with three running roads, Main Line, Loop Line and a Refuse (3rd) Road.

Mackay, Interlock station. “Home” signal. Main Line and Loop Line with a
“Calling On” signal. The “Calling On” signal is not cleared until a train has stopped, a train can proceed to any road as far as the road is clear.


 Oakey, interlocked (I think just one end). Starting signal, Main Line to the west, Cecil Plains Branch and Cooyar Branch with a Shunt signal.

 



“Home” signal with Staff & Ticket Safework system.


 

Stations with just a “home” signal at end of the yard usual have a signal lever near the station building. If the signal is out of sight of the operator, a repeater is installed. Interlocked cabins also have repeater for signal that cannot be viewed.  


Baddow (NCL). Interlocked Starting signals. 

Adding the Dinning Car into the Sunlander after being in shops.


Shunt signals Rockhampton.


Mareeba 

Mackay  (pipe post)

Starting signals Paget. 

Tramway crossing signal in the middle of the station yard. 

Approach Beacon (Distant Signal) replaced in the 1970’s with a Black and Yellow stripped triangle


Beacon for a station with Trailable Facing points (Left hand running) 

Interlocked signal cabin. Electric points and signals one end of the yard.  Spring Bluff.


Electric points and signals controlled by levers in the frame. 
Red levers – Signals.
Blue levers – Lock/fouling bars
Black levers – Points
Black and White strip levers – Splashing lights/Boom gates.
White levers – Not in use.
Green levers – Distance signals 

Signal Cabin with CTC panel to control adjoining sections.

Electric Staff. There were two types, large and as shown above the miniature which were the most popular. Each section had a unique shaped head applicable to that section. Supplement to the Working Time Table listed all section staffs and their shape.

 

Section

Letter

Shape

Caboolture – Elimba

C

Square

Elimbah – Beerburrum

A

Round

Beerburrum – Glasshouse Mts

B

Diamond

Caboolture – Glasshouse Mts (Long Section) Sunday

D

Long Square

Glasshouse Mts - Beerwah

C

Square

Beerwah - Landsborough

A

Round

Glasshouse Mts – Landsborough (Long Section) Sunday

E

Triangular

Landsborough - Mooloolah

B

Diamond

 
  Bell codes were use to communicate between the two stations. The main ones used were.
 

Name of Signal

Signal

Acknowledgement

To call Attention

1 beat

Repeat

Be Ready requesting a staff

 

 

Fast Passenger

4 beats

If section was clear

Breakdown train

4 pause 1 beats

Repeat signal

Slow Passenger or Mixed

3 beats

Give a staff

Empty Cars

3 pause 1 beats

 

Goods or Ballast Train

3 pause 2 beats

 

Light engine

3 pause 3 beats

 

Rail Motor

4 pause 4 beats

 

Livestock Train

4 pause 2 beats

 

Coal Train

2 pause 3 beats

 

Train on Line (train departing)

2 beats

Repeat

Train arrived

1 pause 2 beats

Repeat

Come to the Phone

1 pause 3 pause 1 beats

Repeat and talk

There were others, but never used, if there was an issue you would talk on the phone.  When a train was belled “on line”, you would talk to Control, he would advise whether the train was to go, cross, meal or shunt. If a train was going to have a meal, most times it would cross another train or one would go in advance. The controller would say, 245 will have a meal and cross 266, both to go. If the train was not stopping, you would call for a staff and set the road (points & signals) according. After exchanging staffs and checking the passing train running through the station, you would bell “On Line” to the next station and give “arrival” to the station in the rear, return the staff to the instrument and give times to control. All signals were recorded in the “Train Register” along with any notes applicable. The system worked every well and all stations knew where the trains were. Also, you would have a list of trains for the day which was taken from the Working Time Table and amended according by Train Notices issued. The train list was every handy to assist in planning where you could grab a bit to eat or a cuppa and on night shift where you could pick up 40 winks.    

Staff and Ticket. (The staffs are not on their correct box).

Square – White
Round – Blue
Diamond – Red
Half Diamond – Yellow.
Staff head and box is the same colour. 


This system had no bell signals, there was a list of trains for the day as above, each day approx. train times were given by the Train Controller. About 30 minutes before the expected arrival of a train, you check with control for an update. Most cases you would be required to give the train a “Working” for unattended stations down the line. Instructions to the crew (Driver/Guard) would include what authority they needed for each section, where to cross other trains, where to have a meal. The form would include what time the train in advance left in front of them and the time of the next following train.    
  

If working on the Mt Isa line, this form could have instructions for 10 to 12 stations/sections. Often the crews were asked to speak to the Train Controller at various stations and give their times they were at stations enroute. At attended stations, guards would toss out a list with their time for unattended stations for the Station Officer to give to Control. At times the Station Master and the Guard would chat about the train departure time to be given to Control. Often, they were not the same???

If the next station was attended, just the section authority was given to the traincrew. 

Changing authorities at attended station.

Changing authorities at unattended station on the fly. 

For short sections only one train was allowed in the section at a time. For longer sections trains could follow on time intervals. Over time this changed a bit, in the 1960’s in daylight hours a train could follow another after 15 minutes, at night and on mountain rangers it was 20 minutes. A slow train could follow a passenger or express freight train after 5 minutes.    

Signal Lamps.

McKenzie & Holland


 (same both sides, this is for an Independent Disc)

Adlake 

Side facing approaching trains displaying the signal aspect. 

Back light. If this light is visible to the signal cabin/station, the signal is at stop. No light, signal at proceed or hanging off and the wire needs adjustment.. 

 The inner workings of the signal.



Models.

Westgate and Amby West are both single line workings. Thus, I kept things simple with just “Home” signals.  One end of the yard has a “Calling On” signal. 

Ratio have a range of “OO” plastic signals including a lattice post. I decided on etch brass MSE (Model Signal Engineering) available from Wizard Hobbies in the UK. The signal post is not quite the same as QR but look OK for now. 












The signal post is in two sections, folded to 90° with two rulers.


Both side of each section were tinted first with solder before joining both sections to form the post.

The height of the post was reduced to 24 scale feet, base added and a pin to locate the signal to the layout. The signal arm was fixed into position using a brass pin. Counter weights and rod were added. With a bit of work, the signals could be made operational.  Signals on Amby West were fixed into the stop position. At this point I have not done anything about adding aspect glass. 



Home signal with a “Calling on” signal attached.

Home/Outer Home/Starting Signal. 

Home signal lever on Amby West.

Signal Cabin on Westgate.

 Home signal for Westgate with “Calling On” signal.

Home signal for Wyandra is set at stop. 

Station Master has flagged 1645 pass the Home Signal at stop. The train is being admitted to the Loop or the Main Line is not clear. The Driver would hand out the section authority to the Station Master. The Station Master would yell out what’s happening, i.e. 20 minutes cross 378, the billy is on. 

This a very quick overview of signals that can be used for your layout. The rule book is full of instructions on what trains must do at signals and some modellers may like to go down the path. For single line operations for stations with limited number of trains, one signal at each end of a station yard is all that is required. Having signals make the layout look complete. 

When building both layouts, I didn’t allow a spot for them, they were added later, an afterthought you could say. Thus, they were squeezes in which was a mistake and they could of been better positioned. They do take room and should be planned in with the construction. 

If you are into 3D printing, check out YouTube Sam’s Trains, “Model Train Signals are too expensive…So I didn’t pay”. 

Next month we will go back and finish the “F” wagon story and cover the FJS wagons.

By then, Christmas will be knocking on the door and I hope the man in red will have something for your layout. Time to go shopping. 

Early next year, Amby West has a couple of engagements to start the year rolling. First up in February, 27th & 28th is the “Grumpy Old Modellers Meet” at the Ballina RSL. A couple of layouts, modelling, presentations and fellowship with other modellers. Then in March the 20th & 21st is the Bundaberg Model Train & Hobby Expo.


Until next time enjoy the hobby and have fun. 

Arthur H. 


Acknowledgements.
QR  Book of Rules.
QR General Appendix.